Call us 033-25482521

CESC Thermal Power Plant, Budge Budge

Independently executed the civil works for the following structures :

a) C.W.Pump House

b) C.W.Tunnel

c) Raw Water Treatment Plant (ION EXCHANGE LTD

d) Coal Handling System-A Part  TP-6 By Well Sinking Method (15 m X 15 m size) (-16M)

Reclaim Hopper,Primary & Secondary Crusher House at  M/s C.E.S.C.,Budge Budge 2×250 MW Power Plant.

Work done by :  B.M Kumar as Resident Engineer of  Development Investors Ltd.

Duration of the job: 1995-96