CESC Thermal Power Plant, Budge Budge
Independently executed the civil works for the following structures :
a) C.W.Pump House
b) C.W.Tunnel
c) Raw Water Treatment Plant (ION EXCHANGE LTD
d) Coal Handling System-A Part TP-6 By Well Sinking Method (15 m X 15 m size) (-16M)
Reclaim Hopper,Primary & Secondary Crusher House at M/s C.E.S.C.,Budge Budge 2×250 MW Power Plant.
Work done by : B.M Kumar as Resident Engineer of Development Investors Ltd.
Duration of the job: 1995-96